Knitting shawls with knitting needles: diagrams and description

0
11344

Among scarves, stoles, snoods and scarves, one should single out a separate type of knitwear protecting the neck, namely, a shawl. Shawl is a beautiful triangular type of scarf that not only warms, but also decorates, refreshes the image and is responsible for the necessary accents in the wardrobe of women, girls and girls. You can knit a shawl using both knitting needles and using hookas we did before. But we will pay special attention in this article to knitting shawls with knitting needles.

How to knit a shawl with knitting needles - photo and video tutorials

There are many models of shawls, each with its own strength: openwork shawls are good for autumn and spring, and when choosing the right yarn, they are also suitable for a summer evening; dense shawls perfectly warm and protect in the winter; shawls with frills, hem, fringe will perfectly complement the evening look.

In general, the choice of possible methods for knitting shawls with knitting needles is quite large, both for beginners and seasoned knitters. Beginners knitters will help to master knitting shawls with knitting patterns and description with simple patterns.

Master class for beginners

A simple knitting pattern and a simple pattern - ideal for beginners. This master class in knitting shawls with knitting needles will facilitate acquaintance with knitting shawls, and will not ward off the desire to knit similar products in the future.

Knitting shawls with knitting needles: diagrams and description

Materials for work:

  • Mondial Duetto yarn (50% merino wool, 50% cotton mako; 125 m / 50 g) - 100 g each in beige, yellow, blue-green and black (No. 718, 190, 194 and 200);
  • knitting needles No. 4;
  • hook number 3.

Front surface

Front rows - front loops, wrong rows - wrong loops.

Strip alternation according to the scheme:

Knitting shawls with knitting needles: diagrams and description

Pattern

Knitting shawls with knitting needles: diagrams and description

Working process:

On knitting needles with thread 190, dial 100 p. And knit with the front surface, alternating the colors of the threads as per. scheme. At the same time, on the right edge in each 4th row, decrease 1 point, until all the loops are reduced.

Crochet blue-green thread to tie the shawl around the perimeter 1 near the station. b / n and 1 next to the "step of the dog" (= st. b / n to perform in the direction from left to right).

For each brush, prepare 17 threads of the same color, 20 cm long, connect them together, fold them in half and dress them at a distance of 1 cm from the fold. In total, prepare 8 brushes from black yarn and 9 brushes from beige, yellow and blue-green yarn (= 35 brushes) and sew 10 brushes to the short edge of the shawl and 25 brushes to the long straight edge.

Knitting an openwork model

Probably, any woman sooner or later thinks about replenishing her wardrobe with a beautiful openwork shawl. Is this not a reason to tie it with your own hands? Let us consider in detail how the openwork shawl knits with knitting needles.

Knitting shawls with knitting needles: diagrams and description

Shawl sizes:

Width: approx. 150 cm

Length: approx. 86 cm along the midline of the back.

Materials for work:

  • yarn (100% wool, merino wool content of at least 20%; 50 g / 80 m) - 8 skeins of raspberry;
  • circular knitting needles No. 5.5 and 6 with a length of 80 cm.

Knitting density:

14 p. = 10 cm, knitted with an openwork pattern on knitting needles No. 6.

Scheme:

Knitting shawls with knitting needles: diagrams and description
Knitting pattern. Part 1
Knitting shawls with knitting needles: diagrams and description
Knitting pattern. Part 2

Working process:

On knitting needles No. 5.5, dial 235 p. (The number of loops of the pattern is a multiple of 29 p. + 1 p. + 2 edge loops). Knit on circular knitting needles in the forward and reverse directions. Tie 3 p. elastic band alternately 1 person., 1 out. (1st p.- wrong side of work). Go to the knitting needles No. 6 and continue knitting with an openwork pattern according to the scheme.

Attention: extreme loop on each side = edge loop, these 2 loops are not indicated on the diagram, but are taken into account when calculating the number of loops. Edge loops in all rows knit face!

Decreases are performed at the beginning and end of each row in front of the edge loops, decreases are included in the scheme.

Important: regularly check that the pattern is the same on both sides and that all the cuts and crochets are made.

When 23 loops remain on the knitting needles, the last row of the openwork pattern is made.

Next, tie 1 p. back loops with decreases on the wrong side and continue to perform decreases at the beginning and end of the next row, while simultaneously knitting 3 p. together on both sides of the middle loop.

Then tie 1 p. purl loops with decreases on the wrong side and close the loops, while performing decreases on the edges and knitting 3 p. together on both sides of the middle loop.

Edging

On circular knitting needles No. 5.5, dial from the front side of the work (not including edge loops, thread at work) starting from the typesetting row on the right side, 1 loop from each row of one side, 11 stitches from closed loops and 1 loop from each row of the other side = the number of loops should be a multiple of 234 p. + 1 p. + 2 x 6 p. for the edge = (6 p. for the edge on both sides).

Go to the knitting needles No. 6 and knit the 1st p. as follows: knit the first 6 loops with an elastic band alternately 1 person., 1 out., then knit all the loops on the wrong side and add 1 p. approximately every second loop, knit 1 wrong side loop from the bottom row in front of the loop on the needle, then knit loop on the knitting needle.

Important: make sure that there are the same number of loops on each side of the middle loop.

Finish 6 p. With an elastic band.

Next, continue to knit 6 loops with an elastic band for the edge on both
sides, knit the rest of the stitches according to the pattern marked “rapport” (the number of stitches of the pattern must be a multiple of 29 p.) = start from the front.

Having connected the first 9 p. according to the scheme, finish 1 p. wrong side on the wrong side, then tie 3 p. an elastic band (according to the drawing of the edge) and close the loop.

How to knit a mohair shawl

Mohair shawls - tenderness and airiness itself. Such products are very decorate and warm, but how to cheer up! How to knit from mohair shawl knitting? The diagram and description will help to figure this out.

Knitting shawls with knitting needles: diagrams and description

Product Dimensions:

135 x 138 cm.

Materials for work:

  • yarn (70% mohair, 30% silk; approx. 210 m / 25 g) - approx. 175 g of blue, 50 g of beige and pink;
  • circular knitting needles No. 4.5, length 120 cm.

We knit patterns

Garter stitch

Front and back rows - front loops.
With circular knitting, knit alternately 1 row of facial, 1 row of purl.

Openwork pattern according to the scheme:

Knitting shawls with knitting needles: diagrams and description

Knit as shown. Distribute the hinges according to the instructions.

In height, repeat from the 1st to the 16th p. With each repetition of the 16th p. the width pattern is reduced by 1 rapport between arrows a and b.

Lane sequence

* 2 p. beige, 2 p. pink, 2 p. blue, from * repeat.

Edging edge

In all rows, knit the first and last loops front = nodular hem edge.

Left Decrease

Front row: 3 p. Knit together front, 1 yarn, chrome .;
wrong side: chrome., 3 out.

Knitting density

18 p. X 36 p. = 10 x 10 cm, knitted in two strands with garter strings in the indicated sequence;
19 p. X 26 p. = 10 x 10 cm, connected by an openwork pattern.

Important: the product is knitted in 2 threads. The arrow in the drawing indicates the direction of knitting.

Pattern:

Knitting shawls with knitting needles: diagrams and description

Working process:

Type on knitting needles with a double blue thread (= double double thread) 255 loops crossed and knit 1 out. a number of purl.

Continue to work with an openwork pattern, for this, start with 5 p. In front of arrow a, repeat 12 p. Between arrows a and b, perform 18 x, knit 24 p. Between arrows b and c, finish 10 p. After arrow c.

After the 1st p. the pattern on the knitting needles should be 255 p.

After 6 repetitions of the openwork pattern in height, continue to work with a garter stitch: knit strips in the indicated sequence of colors, while on the left edge continue to perform decreases for beveling, until only 4 sts remain on the knitting needles. Then close these loops according to the pattern in one row.

Video lesson

It will be easier for beginner knitters to get comfortable with knitting a beautiful air shawl, if you look at a detailed master class in knitting from a professional. In this case, we will talk about knitting a delicate openwork shawl in a classic style.

Video: knitting shawls

LEAVE ANSWER

Please enter your comment!
Please enter your name here